Hallett 5


List


 


 

Number of turbines 25   Av. households supplied 26,301 households
Rating of turbines 2.10 MW Carbon dioxide saved:    
Wind farm size 52.50 MW        CO2 displacement 135,211 tonnes p.a.
Predicted output 160,965 MWhr p.a.            
Note: The capacity factor used in these calculations is 35.00%.

Provisional Development Planning Consent was granted by the Goyder Regional Council in November 2004 for The Bluff Range Wind Farm (Hallett 5).  This site will consist of 25 wind turbines positioned along the uniquely defined ridge - a textbook location for generating wind energy.

The site capacity could be up to 50MW, which would further contribute to the dominance of the Mid North region of South Australia as a leader of renewable electricity generation throughout Australia.  

Project Manager

Stuart Whiting


List


 


 

The Bluff Range is an excellent resource for wind energy